Elster Alpha Plus Meter Technical Manual

ALPHA Plus Means Powerful Metering Elster Electricity’s ALPHA Plus meter is a powerful meter that builds on the patented ALPHA® metering technology. The ALPHA Plus meter can be a single phase, 240 volt, one–rate demand meter or a polyphase, wide voltage supply, multi–rate. Specifications and Technical Data Absolute Maximums Voltage. The A3 ALPHA® meter uses Elster's patented digital measurement techniques that offer high accuracy, repeatability, and low ownership costs. Building upon standard meter design that includes form consolidation, voltage and class consolidations, 0.2% accuracy class meters, functional scalability and standard two week lead times, the A3 ALPHA.

  1. Elster Alpha Plus Meter Technical Manual
  2. Elster Alpha Plus Meter Technical Manual Download
  3. Elster Alpha Plus Meter Technical Manual Pdf
  4. Elster Alpha Plus Manual
  5. Elster Alpha Plus Meter Technical Manual Free
<ul><li><p>January 2009 IL42-4203C</p><p>ElsterRaleigh, North Carolina USA+1 800 338 5251 (US Technical Support)+1 905 634 4895 (Canada Main)support@us.elster.comwww.elsterelectricity.com</p><p>A1800 ALPHA Meter Installation Instructions</p><p>GeneralThis leaflet contains general installation instructions for 4-wire and 3-wire applications of the A1800 ALPHA meters. All meters are factory-calibrated and tested before shipment. For proper installation, accuracy, and maximum life of the meter, use the following installation procedures. For more information about the operation of the meter, see the A1800 ALPHA Meter Technical Manual (TIM42-2410).</p><p>DANGER!</p><p>Dangerous votlages with high current capabilities are present. Use authorized utility procedures to install and service metering equipment. Equipment damage, personal injury, or death can result if safety precautions are not followed.</p><p>Preliminary InspectionThe A1800 ALPHA meter is calibrated and tested at the factory, and it is ready for installation. Follow proper installation and removal procedures for personal safety and protection of the meter.Before installing and applying power to the A1800 ALPHA meter, a quick inspection of the meter itself is recommended. Check for some of the following items:</p><p> no broken or missing parts no missing or broken wiring no bent or cracked components no evidence of overheating check the nameplate to make sure it is appropriate for the service</p><p>Physical damage to the outside of the A1800 ALPHA meter could indicate potential electronic damage in the inside of the meter. Do not connect power to a meter that is suspected to have unknown internal damage. Contact your local Elster representative if you suspect your meter may be damaged.</p><p>Placing the Meter into ServiceSee Wiring Diagrams on page 7 for illustrations of both internal and connection wiring diagrams.</p><p>WARNING!</p><p>Circuit-closing devices must be used on current transformer secondaries. Dangerous currents and voltages are present if secondaries are open-circuited. Personal injury, death, or equipment damage can result if circuit-closing devices are not used.</p><p>CAUTION!Make sure to install the correct meter for the service type, maximum current, and capacity required. Always verify that the maximum meter voltage and current ratings are equal to or greater than the maximum service voltage and current. Installing inappropriate meters can damage equipment.</p><p>To use the A1800 ALPHA meter effectively and safely, follow this procedure:1. Make sure that the meter hanger, located on the base of the A1800 ALPHA meter, is in the desired position. Sliding the </p><p>hanger down to the hidden position will hide the top supporting screw.2. Use at least an M6 screw for the top supporting position and hang the meter on it, making sure it is level. The meter will </p><p>operate correctly in any position, but failing to mount the meter in a proper vertical position will place the other mounting holes at the wrong place on the mounting panel.</p></li><li><p>IL42-4203C January 2009</p><p>2</p><p>3. Use at least an M6 screw in each of the bottom supporting screws to secure the A1800 ALPHA meter enclosure; the mounting holes are 7.1 mm (0.28 inches) in diameter.</p><p>WARNING!</p><p>Before wiring the meter into the power circuit, use authorized utility procedures to install proper ground connections on all appropriate VT and CT circuits and on the meter ground terminals. Also, be certain that CTs on energized lines are securely short-circuited either with circuit-closing test switches or with properly installed conductors. Dangerous voltages can be present. Personal injury, death, or equipment damage can result from wiring an ungrounded meter or mishandling improperly grounded metering transformer circuits.</p><p>4. Install the ground connections.</p><p>NOTICEA1800 ALPHA meter terminals are designed for optimum use with copper wiring. For direct connect-rated meters, aluminum wiring can be used but if so, it is extremely important to use proper aluminum wiring practices. Aluminum wiring compound or wiring paste (grease) should be used when attaching the bottom-connected terminals. Tighten the connections, allow them to relax for a few minutes, then tighten them again. This will minimize the cold-flow effects of aluminum cable. Failure to observe correct practices for installing aluminum wiring could lead to overheating of the terminals, equipment failures, or damaging fires. Where possible, Elster recommends copper-compatible meter terminals and aluminum wire. Such adapters also can provide for use or larger aluminum conductors that can be otherwise used in the terminals of the A1800 ALPHA meter.</p><p>5. Ensure that primary or system voltages are either disconnected from a power source or that utility safety practices for handling live circuits are strictly followed.</p><p>6. If applicable, ensure that any current transformers are de-energized with no high-voltage primary voltage connected to their primaries and no primary current circulating through them. If primary current and voltage are present in the current transformers, it is extremely important to verify that safety shorting connections are in place on all secondary winding connections prior to handling CT connections to the meter.</p><p>7. Wire the meter using color-coded wire according to locally applicable specifications. The terminal block dimensions on the A1800 ALPHA meter support cable sizes of approximately 5 mm in diameter for transformer rated connections (10 mm in diameter for direct connect).</p><p>8. After wiring the meter and making any communication and relay connections, assemble the terminal cover and apply power.</p><p>Figure 1. A1800 ALPHA meter mounting screw locations</p><p>Hanger screw mount</p><p>Screw mounts</p></li><li><p>January 2009 IL42-4203C</p><p>Figure 2. A1800 ALPHA meter with RS-232 as second communication port</p><p>Figure 3. A1800 ALPHA meter with RS-485 as second communication port</p><p>Pulse output relays (optional)</p><p>RS-232 connector</p><p>RS-485 terminals</p><p>RS-232 connector (optional)*</p><p>*Present when optional second communication port is installed</p><p>1 2 3 4 5</p><p>6 7 8 9</p><p>RS-232 connector</p><p>1 = NC2 = Rx3 = Tx4 = DTR5 = GND</p><p>6 = DSR7 = RTS8 = NC9 = NC</p><p>Tx+ Rx-</p><p>Tx- Rx+</p><p>RS-485 connections</p><p>A B C D</p><p>A = Wh delB = varh delC = Wh recD = varh rec</p><p>Pulse output relay default values</p><p>Pulse output relays (optional)</p><p>RS-232 connector</p><p>RS-485 terminals</p><p>RS-485 terminal (optional)*</p><p>*Present when optional second communication port is installed</p><p>1 2 3 4 5</p><p>6 7 8 9</p><p>RS-232 connector</p><p>1 = NC2 = Rx3 = Tx4 = DTR5 = GND</p><p>6 = DSR7 = RTS8 = NC9 = NC</p><p>Tx+ Rx</p><p>Tx Rx+</p><p>RS-485 connections</p><p>A B C D</p><p>A = Wh delB = varh delC = Wh recD = varh rec</p><p>Pulse output relay default values</p></li><li><p>IL42-4203C January 2009</p><p>4</p><p>Installing a TOU BatteryThe TOU battery is replaceable without breaking the meter seal. Use only Elster-recommended TOU batteries. See your Elster representative for details.</p><p>WARNING!</p><p>The meter should be de-energized before installing the battery. Dangerous voltages are present; and equipment damage, personal injury, or death can result if safety precautions are not followed. Use authorized procedures to install the battery while power is removed from the meter.</p><p>Before installing the battery, the A1800 ALPHA meter must have been energized for at least 1 minute within the preceding 60 minutes. This ensures that the supercapacitor is properly charged and that the battery is not immediately drained upon installation. If this is not done, then the battery may be damaged and the meter may not function correctly. While the meter is powered, verify that the LCD is active and functioning.To install the battery:1. If the meter has not been energized for at least 1 minute during the previous 60 minutes, energize the meter for 1 minute.</p><p>If the meter has been energized for at least 1 minute during the previous 60 minutes, proceed to step 2.2. De-energize the meter.3. Remove the terminal cover screws and seals.4. Remove the terminal cover to expose the battery well.</p><p>Figure 4. Battery well and connector</p><p>5. Slide the battery leads into the connector to the right of the battery well.6. Place the battery firmly in the battery well.7. Replace the terminal cover.8. Energize the meter and verify that the LCD becomes active and functioning properly.</p><p>Verify that the low battery symbol on the meter LCD is not displayed.9. Replace the terminal cover screws and seals.10.Reprogram the meter or clear the errors (as necessary).</p><p>Troubleshooting</p><p>NOTICENot following this procedure can cause the meter to function improperly. In case a battery has been installed correctly and the meter is not functioning properly (for example, display is blank but the meter is powered), use the following procedure.</p><p>1. De-energize the meter and let it sit without power for 48 to 72 hours. This provides sufficient time for the supercapacitor to discharge and for the microcontroller to shut down.1</p><p>2. Energize the meter for at least 1 minute. The microcontroller should power up correctly and the supercapacitor will charge. Verify that the LCD becomes active and functioning correctly.</p><p>3. De-energize the meter and insert the battery, following the instructions earlier in this section.</p><p>1 If the battery was installed with the polarity reversed, the battery should not be damaged. If the battery was installed without having the meter properly energized, then the battery will lose approximately 8.5 % of its service life each day.</p><p>TOU battery</p></li><li><p>January 2009 IL42-4203C</p><p>5</p><p>If the meter still does not function properly, then it should be returned to the factory.</p><p>Initial SetupAfter installing and powering the A1800 ALPHA meter, verify the following:</p><p> The system service voltage test (if enabled) shows the valid service for this installation. The phase rotation, service voltage, and service type should be indicated on the LCD. Other validation information can be obtained using the system instrumentation display quantities.</p><p> All potential indicators (from 1 to 3 depending on the wiring) are present and are not blinking. A blinking indicator means that the phase is missing the required voltage or is below the programmed minimum voltage threshold value.</p><p> The LEDs are blinking and the energy direction indicators on the LCD show the correct energy flow direction. Required meter seals are in place. Any information (such as registration and location of the meter) has been recorded.</p><p>NOTICEIf the meter is not working correctly after it has been installed, then check for improper installation or wiring. If the installation and wiring are correct, then verify these other areas:</p><p> the meter installation matches the meter nameplate the correct type of A1800 ALPHA meter is installed in the existing service no evidence of mechanical or electrical damage to either the meter or the installation location the service voltage falls within the operating range as indicated on the nameplate the optical port is free of dirt or other obstructions</p><p>Figure 5. A1800 ALPHA meter LCD</p><p>Marking the Utility Information CardThe utility information card can be removed without breaking seals and removing the meter cover screws. Note: the direct connect meter uses a blank card.To remove the utility information:1. Remove the terminal cover as described above.2. Grasp the protruding utility information card tab firmly and pull the card out slowly from under the meter cover.</p><p>Energy direction indicators</p><p>Error/warning indicator</p><p>Low battery indicator Phase indicators (3)</p><p>Quantity identifier</p><p>Alternate mode indicator</p><p>Comm. port indicator</p><p>Power/energy units identifier</p><p>Tariff indicators 1 to 8(left to right)</p><p>EOI indicator</p><p>LC indicator</p><p>Cover removed indicator</p><p>Test mode indicator</p><p>Display quantity</p></li><li><p>IL42-4203C January 2009</p><p>6</p><p>Figure 6. Removing the utility information card</p><p>3. Mark the card as needed.</p><p>Removing the Meter from ServiceUse the appropriate procedure when removing an A1800 ALPHA meter from service.</p><p>WARNING!</p><p>Use authorized utility procedures to remove metering equipment. Dangerous voltages are present, and equipment damage, personal injury, or death can result if safety procedures are not followed.</p><p>WARNING!</p><p>Circuit-closing devices must be used on current transformer secondaries. This applies to CT-connected meters. Dangerous currents and voltages are present if secondaries are open-circuited. Equipment damage, personal injury, or death can result if circuit-closing devices are not used.</p><p>If it becomes necessary to remove an A1800 ALPHA meter from service, use the following procedure:1. Before disconnecting the meter, make sure that the existing meter data has been copied, either manually or electronically </p><p>using Elster meter support software.2. Remove the voltage and disconnect the current circuits.3. Break the seal holding the A1800 ALPHA meter terminal cover in place.4. Remove the terminal cover screws and take off the terminal cover.5. Disconnect the wiring.6. Remove the lower supporting screws.7. Lift the meter off the top supporting screw.</p><p>Removing the Battery</p><p>WARNING!</p><p>The meter should be de-energized before removing the battery. Dangerous voltages are present; and equipment damage, personal injury, or death can result if safety precautions are not followed. Use authorized procedures to remove the battery while power is removed from the meter.</p><p>Use the following procedure to remove a battery from an A1800 ALPHA meter:1. De-energize the meter.2. Remove the terminal cover to expose the battery well.3. Firmly grasp the battery and lift it from the well.4. Disconnect the battery leads from the connector.5. Replace the terminal cover and ensure the seals are in place.</p></li><li><p>January 2009 IL42-4203C</p><p>7</p><p>If the removed battery is still in working condition, it can be stored safely for future use. Non-functioning batteries should be disposed of according to local laws, regulations, or electric utility policies.</p><p>Wiring Diagrams</p><p>Direct ConnectedThe A1800 ALPHA meter can be ordered for direct connected service. Refer to the wiring diagram on the nameplate for each meter for specific terminal assignments. All connections are equipped with combination-head screws that accept either a slotted or Phillips screwdriver.</p><p>Figure 7. 3-element, 4-wire wye or 4-wire delta</p><p>Figure 8. 2-element, 3-wire delta or 3-wire network</p><p>1 3 7 94 6 10 12</p><p>L1</p><p>L2</p><p>L3</p><p>N</p><p>L2</p><p>N</p><p>L1L3</p><p>1 3 7 94 6</p><p>L2 or N</p><p>L1</p><p>L3</p><p>or</p><p>N</p><p>L1L3</p><p>L1</p><p>L2</p><p>L3</p></li><li><p>IL42-4203C January 2009</p><p>8</p><p>CT-connected meters</p><p>Figure 9. 2-element, 3-wire delta, transformer connected</p><p>Figure 10. 3-element, 4-wire current transformer, sequential connection</p><p>1 2 3 5 7 8 9</p><p>3</p><p>2</p><p>1LINE</p><p>LOAD</p><p>2</p><p>1 3</p><p>1 2 3 4 5 6 7 8 9 11</p><p>N</p><p>3</p><p>2</p><p>1LINE</p><p>LOAD</p><p>2</p><p>1 3</p><p>N</p></li><li><p>January 2009 IL42-4203C</p><p>9</p><p>Figure 11. 3-element, 4-wire current transformer, symmetrical connection</p><p>Figure 12. 3-element, 4-wire instrument transformer, sequential connection</p><p>1 2 3 4 5 6 7 8 9 11</p><p>N</p><p>3</p><p>2</p><p>1LINE</p><p>LOAD</p><p>2</p><p>1 3</p><p>N</p><p>1 2 3 4 5 6 7 8 9 11</p><p>N</p><p>LINE</p><p>2</p><p>1 3</p><p>N</p><p>3</p><p>2</p><p>1LOAD</p></li><li><p>IL42-4203C January 2009</p><p>10</p><p>Figure 13. 3-element, 4-wire instrument transformer, symmetrical connection</p><p>1 2 3 4 5 6 7 8 9 11</p><p>N</p><p>3</p><p>2</p><p>1</p><p>2</p><p>1 3</p><p>N</p><p>LINE</p><p>LOAD</p></li><li><p>January 2009 IL42-4203C</p><p>11</p><p>Mounting dimensionsThe A1800 ALPHA meter has the mounting dimensions as shown in the following...</p></li></ul>
Providing you the best range of Themis-alpha diaphragm gas meters, Diaphragm Gas Meters, Q.sonic-plus Ultrasonic Gas Flow Meter, Absolute Encoder AE2, TRZ2 and Rabo G16 - G250 Rotary Gas Meters with effective & timely delivery.
Interested in this product?
The smart multi-functional themisalpha index for diaphragm gas meters provides features, which go well beyond simple remote reading. The combination of existing options (time- and load-dependent tariffs, valve control, load profiles, communications interval control, data logging, etc.) enables the index to be adjusted to suit the needs of individual customers.
A wide range of communications solutions for the themis-alpha index guarantee the authenticity and integrity of the data transferred between the communications partners and also allow granting authorization to users. For example M-Bus (wired or wireless), GSM/GPRS or ZigBee communications modules are available for various markets. A secure, remotely controlled software update and the modular principle guarantee that the technology is future-proof and also that it can be adjusted to meet new challenges retrospectively at low cost if necessary.
Meter

Elster Alpha Plus Meter Technical Manual

View Complete Details

Interested in this product?
Index for Diaphragm Gas Meters
The CHEKKER is a patented meter which generates a two-digit check number in its index. The number is generated mechanically and the system requires no maintenance. This check number is encoded. When the meter is read out the check number is also registered and, with the help of a software module, the number enables the user check whether the meter reading is right or wrong. To do this, the check number is automatically decoded before the data is processed by the billing system.

View Complete Details

Interested in this product?
The new Ultrasonic gas flow meter Q.Sonicplus is a six-path meter, and subject to an ‘enhanced’ Elster-Instromet patent, with more functionality, bringing about new end-user benefits, along with greater processing power that yields a lower measurement uncertainty.
Software and additional installation instructions are available in the central download area.

View Complete Details

Plus
Ask for Details
Interested in this product?
The TRZ2 is serially equipped with permanent lubrication bearings as well with the mechanical S1 Index. From ANSI class 300 upwards all meters are equipped with manual oil pump as standard.

View Complete Details

Interested in this product?
RABO combines tried-and-tested product features of previous rotary gas meters from Elster-Instromet and is a convincing product because it offers a large range of future-oriented features. The device is suitable for measuring gases of the first, second and third families pursuant to EN 437:2009 and for measuring a range of technical gases.

View Complete Details

Meter

Elster Alpha Plus Meter Technical Manual Download

Interested in this product?
The EK280 can be equipped with a GSM / GPRS modem and a power supply unit (Zone 2) and thus covers the requirements for volume conversion, data logging and remote data transfer in a single device. In addition, the device features other digital inputs and allows for connection of a second pressure and/or temperature sensor. Status signals and measurements (e.g. door contact, SSV, inlet pressure, etc.) of a gas measurement and control system can thus be recorded and transferred to remote control or SCADA systems for monitoring purposes via a separate interface.

View Complete Details

Interested in this product?
The unique design of the 3000 industrial regulator is used for distribution, commercial and industrial applications. It is best suited for furnaces, batch ovens and boilers.

View Complete Details

Interested in this product?
The FC1 flow computer with its technical concept sets innovative standards as a basis for flexible customer-orientated solutions. A modular system design for both, hardware and software, combined with a modern full graphic touch screen display, makes a forward-looking, next-generation flow computer.
Software and additional installation instructions are available in the central area.

Elster Alpha Plus Meter Technical Manual Pdf

View Complete Details

Interested in this product?

Elster Alpha Plus Manual

The gas-net F1 is an electronic flow computer for natural and industrial gases with an integrated data logger. The device can be combined with various intrinsically safe or explosion-proof pressure transmitters and temperature sensors.
The gas-net F1 is able to correct up to three streams with one or two flow directions per stream.

Elster Alpha Plus Meter Technical Manual Free

View Complete Details